MrMilkdud March 22nd, 2019 1:40pm
I’m replacing my driveway. Company 1 uses standard grade, with 1/2 inch rebar in a 12 inch grid throughout. Company 2 is 1/2 the price, uses limestone concrete, and only uses rebar every 4 feet at the joints. Both insist the other uses a bad method.
Comments: Add Comment