Show of HandsShow of Hands

JLe May 28th, 2018 4:53pm

(Logic Question) If it takes 10 chefs 10 minutes to make 10 pizzas, how long would it take 100 chefs to make 100 pizzas?

9 Liked

Comments: Add Comment

JLe
05/28/18 3:55 pm

Let’s assume the kitchen is large enough and there are enough ovens.

jlong105 Indiana
05/28/18 4:56 pm

10 minutes then

jlong105 Indiana
05/28/18 3:49 pm

Logic tells me I need to know how many ovens

Reply
TheMadScientist the mad laboratory
05/28/18 2:36 pm

You assume a linear growth relationship. 100 simultaneous pizza requires a very different facility. My guess is the limiting factor isn’t the number of chefs, but the number of ovens. Now, that doesn’t mean there isn’t also an issue with resource distribution ...

pof over my moms knee
05/28/18 2:33 pm

Not enough information is given.

Reply
JayBlotus
05/28/18 2:02 pm

If they have enough ovens

Reply
JLe
05/28/18 1:56 pm

Logic (philosophy) involves math: Logic—“the systematic use of symbolic and mathematical techniques to determine the forms of valid deductive argument.”

SuperAgain They lie, Get Over It
05/28/18 11:29 am

If they’re using the same kitchen & oven as the 10 chefs did, it could be 100 minutes or longer. ...too many cooks in the kitchen. 😉

Reply
knetzere Illinois
05/28/18 11:42 am

I was going to ask the same thing. Not even sure 100 chefs could make 100 pizzas in the kitchen made for 10 chefs